Wednesday, October 9, 2013

Solving Decreasing Sales With Lean Six Sigma


declining salesOnline retailer ABC sells books, DVDs, CDs, MP3 downloads, software, video games, apparel, furniture, food, toys and jewelry. ABC has a strong market research unit and a seamless feedback loop for enhancing the customer experience. In the last few years, however, sales had dropped significantly contributing to a slip in the overall market share of ABC.
The CEO of ABC asked his executives, “If we are constantly collecting market and customer feedback, why are our sales so low? Especially given that we have highly productive teams and that our market research team was recognized as the best in the industry last year.”

An Outside Eye

John Smith, an independent Lean Six Sigma (LSS) consultant was invited by the CEO to guide ABC in improving their declining sales. Smith spent some time talking to key personnel from different teams; a few of the teams shared statistics around the productivity of their individual teams as well.
The consultant’s first observation was that each of the teams within the company operated in a silo. Each team reported their capacity, productivity and output individually. This meant that the end-to-end process of translating customer feedback to a better online customer experience was not being seen as an enterprise-level process. For example, e-Strategy responded to the findings from Market Research in isolation of the Product and Service teams.
One of the company’s executives asked Smith, “Is isolation really an issue? What does it have to do with low sales?”
Smith explained that when the teams respond independently, they don’t have an opportunity to review each other’s data and weigh in before a recommendation is sent directly to Solution and Delivery to get implemented. It is possible that a solution devised by one team could impact the work of another team. Without coordination among teams, their isolated efforts could lead to rework, overproduction or other wasted work – thereby contributing to a decrease in the percentage of customer feedback items being translated into features.
Smith explained that when the teams respond independently, they don’t have an opportunity to review each other’s data and weigh in before a recommendation is sent directly to Solution and Delivery to get implemented. It is possible that a solution devised by one team could impact the work of another team. Without coordination among teams, their isolated efforts could lead to rework, overproduction or other wasted work – thereby contributing to a decrease in the percentage of customer feedback items being translated into features.

Outputs vs. Outcomes

Prioritizing customer feedback with respect to multiple parameters such as value, risk, cost of implementation and speed to market is only possible when there is a single, organizational framework to manage improvement activity. Smith proposed that the productivity of the teams should be measured based not only on output but also on outcomes.
Consider two of ABC’s website issues: 1) inconsistent branding and 2) performance issues due to an increased number of concurrent users (leading to people dropping out before finishing a transaction). Imagine also that it is four weeks before the Christmas shopping season begins – a time when the number of concurrent users increases by at least 50 percent.
The Marketing team’s priority is to get the branding correct and may be able to get those requirements to Solution and Delivery quickly without talking to Operations. But why worry about online branding if the website is already unable to cope with the existing customer traffic? Parallel processing generally focuses on individual team outputs; with an overarching improvement framework, priorities become clearer and the focus can be shifted to customer outcomes.

The Big Y

Smith described a hypothetical situation in which LSS governed at the enterprise level the overall process of translating customer feedback to a better customer experience. The big business Y in this enterprise-level process is decline in sales figures.
There are likely multiple causes contributing to the Y, Smith noted. Without having performed detailed analysis, he suggested looking at productivity and output. Various ABC teams had spoken to Smith about their individual team’s productivity as a positive metric; they were delivering a significant amount of output. The incongruity between the perceived high productivity and the declining sales led Smith to want to investigate further.
Figure 1: Market Research Feedback Loop
Figure 1: Market Research Feedback Loop
Smith shared Figure 1 with the executive team. The process shown is that of the information technology (IT) division, which helps translate feedback from online customers into product features. There are multiple stakeholders involved in this process, ranging from the survey company (external to ABC) to the internal marketing team, and from operations to the IT teams. Smith noted, “This process cuts across 10 separate teams. I have assumed productivity of about 90 percent for each team. This – in Six Sigma terminology – is the unit yield for a team. That means, irrespective of the total capacity of the team, 90 percent of the customer feedback that a team receives is incorporated into website enhancements or some process change.”

Unit Yield Versus Final Yield

Smith directed his next comments to the CEO: “This is what you see in all performance dashboards. The usual misconception is that if all the teams have a productivity of 90 percent, the average productivity for the entire process should be about 90 percent. In effect, what that should mean is that 90 percent of the feedback captured during market research translates tangibly into improvements that reach your customers. So if that was the case, why are the sales so low? The reality, however, is that only 35 percent of the feedback captured by market research translates into some tangible action. And in most cases the feedback is outdated by the time any action has been taken. Look at what happens with a mathematical model when all of the contributing teams have the same productivity.”
Productivityenterprise level = (Productivityteam)number of teams  or
Yieldoverall = (Yieldstep)number of steps
Smith continued to address the executives of ABC: “In this example of a sequential process, the productivity (unit yield) of individual teams is about 90 percent, but you have to multiply them to get an accurate measure of enterprise-level productivity (final yield). They cannot be averaged. Think of the first two teams in this process. The process begins with 100 customer feedback items at the Market Research team and 90 pass. The starting number for the e-Strategy team is then 90, not 100, and 90 percent of them pass, leaving 81. The average team yield is 90 percent but the final team yield is only 81 percent. This is how the full IT process has a predicted final yield of only 35 percent, resulting in customer dissatisfaction and poor sales.
This sequential example highlights the effect of measuring productivity at the team level without having an enterprise-wide view. Of course, the problems that ABC faced were multi-dimensional – there was more than one cause contributing to the Yof declining sales.

Operating Costs

Productivity often does not fully reflect the cost dimension of a problem, Smith explained to the ABC executives. Operating costs also affect a company’s bottom line – even if sales increase. By not having a cross-functional team or enterprise-wide process management, the unnecessarily large number of steps and teams can lead to higher operating costs related to failure, overproduction, rework, etc.
Although increasing sales is pivotal, optimizing operating costs is paramount in order to assure sustained profits. To understand the costs of ABC, it is important to examine the journey of the items leading to the 35 percent final yield.
Consider two teams in an overall process through which 100 items begin with Market Research and then need to pass through Product and e-Strategy. Assume the cost of operations of the Product team is $X per year and $3X per year for the Strategy team. In addition, assume that each team has 10 critical-to-quality characteristics to meet. The individual team yield is 90 percent for both teams so there is the possibility that each team will produce 10 defects in 100 defect opportunities. In terms of their ability to produce defect-free quality characteristics, they are at the same level.
But what is the cost of fixing such defects and the costs of rework or additional handoffs? If the costs are $Z for the Product team, then they are $3Z for the e-Strategy team. In this case, improving the productivity (throughput yield) will help improve the sales numbers, but it is critical to look at optimizing the operations to maintain long-term viability. Having a high number of teams with varied costs of operations combined with the lack of an overarching improvement framework put the company in a losing situation. This situation can be mitigated by having cross-functional teams work on a prioritized set of items delivering incremental value.

High-level Recommendations

Smith suggested that ABC enact an enterprise-wide transformation program to improve sales and profits using LSS. The key areas of focus of this transformation would include team rationalization, review of operating cost bases, a review of the current delivery methodology and reporting. In each of these areas, Smith applied the LSS filters to identify and eliminate waste as well as improve the quality at each stage – all contributing to an increase in the overall throughput.
In the end-to-end value chain of ABC, there were 10 different teams. When looked at with a Lean filter, it was obvious that a significant amount of handoffs, rework and motion contributed to a low throughput. Smith recommended forming cross-functional teams by identifying the groups with similar objectives. Figure 2 shows the value chain before and after this rationalization exercise.
Figure 2a: End-to-end Value Chain of Teams – Before Rationalization
Figure 2a: End-to-end Value Chain of Teams – Before Rationalization
Figure 2b: End-to-end Value Chain of Teams – After Rationalization
Figure 2b: End-to-end Value Chain of Teams – After Rationalization
The rationalization resulted in a 40-percent reduction in the number of individual teams. This was a significant step for ABC as it reduced the number of non-value-added steps in the overall process and facilitated greater collaboration among team members. The reduction in the number of teams resulted in fewer handoffs, leading to a seamless flow of information.

Leaving Behind the Waterfall

The existing delivery approach in the IT department of ABC was a traditional waterfall methodology, a sequential design process used in software development in which progress is seen as flowing steadily downward (like a waterfall) through the phases of conception, initiation, analysis, design, construction, testing, production/implementation and maintenance. In the initial scenario with up to 10 teams, following a waterfall delivery created an issue with the speed to market. Apart from speed to market, most of the supposed value propositions seem to become outdated by the time they were delivered.
With fewer steps and teams in the value chain, the speed to market will improve, but further improvement is still needed. In the ideal state, ABC would deliver against a prioritized set of feedback items (prioritized against such considerations as value, risk, cost of implementation and speed to market) that are not already outdated, using a seamless feedback loop.
A key limitation with the waterfall process is the expectation that all of the best ideas have to occur at the beginning of a project. In reality, good ideas can appear at any time. A rigid, change-resistant process (even if leaner) tends to produce mediocre products, sometimes at a point in time after the customer has moved on to another company. Achieving maximum throughput, even in a Lean organization, requires each step to deliver as much value as possible at regular intervals all along the process.
By adopting an agile delivery approach, which is more flexible than the waterfall approach and follows an iterative process to deliver value quickly, the productivity of each ABC team was further increased. Using agile meant that the cross-functional teams worked collaboratively to prioritize the items that were identified by the market research team and started to deliver upon those priorities in chunks. The teams delivered more value incrementally and were able to respond to market changes dynamically. The other key benefit of this approach was that an item identified in the most recent customer survey could jump onto the priority list if it was deemed to have the potential to deliver greater value than other priority items. Introducing new changes were easier and the products became more relevant to the customers of ABC at a faster pace.
Figure 3: The Combined Power of Lean and Six Sigma
Figure 3: The Combined Power of Lean and Six Sigma
The recommendations for ABC can be summed up in LSS terminology by the figure in Figure 3. The y-axis is the number of teams that were part of the initial value chain. The rationalization of the teams (the reduction from 10 to six) was achieved by eliminating waste using Lean. The adoption of an agile approach (as opposed to the existing waterfall approach) improved the quality and productivity of each of those steps and teams. Lean and Six Sigma complement each other and tackle problems multi-dimensionally. Lean helps reduce non-value-added steps in a process by eliminating rework, handoffs, motion, etc. Six Sigma works relentlessly to improve the quality of the value-added steps, which contributes to reliability at the enterprise level.
The other key recommendation to ABC was the acknowledgement that each team has a different cost of operation and, therefore, a different associated cost of failure or rework. By creating cross-functional teams with representatives from each of the departments, the total cost of failure was also reduced.

LSS Powers ABC

LSS provided a structured approach to eliminate waste, reduce the cost of failure, and improve the throughput yield and speed to market of the overall processes for ABC, resulting in higher end-customer satisfaction. LSS also helped to deliver products in a manner that optimizes resources and increases value to meet customer expectations. This is exactly how Lean and Six Sigma in combination can drive greater benefits at the enterprise level than either alone.
For ABC, the number of handoffs and rework were significantly reduced and contributed to an increase in individual team yields. The pace and relevance of value delivered by ABC also increased as the teams worked against a prioritized set of feedback items, focusing on producing incremental value. Customer satisfaction increased and so did the sales.

Sunday, August 21, 2011

PROCESS MANAGEMENT (http://www.qualityintegration.biz/BusinessProcessManagementShort.html)

PROCESS MANAGEMENT

Business process approach
Professional process management approach is a great opportunity to all organizations for enhancing overall business performance and realizing modern professional quality management and quality assurance.
A comprehensive approach to practice process management covers following topics: 
- Recognizing general concepts, guiding ideas, and principles of business processes and process management 

- Understanding development stages in the process management

- Developing business processes from strategic needs of an organization and within organization's business system and its networked environment
- Integrating process management practices within operational and strategic business management
- Realizing quality integration through process management
- Applying effective information /communication technology for process management that also covers documentation needs
- Monitoring, evaluating, and analyzing process performance
- Understanding people issues in process performance and management including knowledge and mental aspects
- Taking consistent measures for process performance improvements
- Striving for a comprehensive enhancement of the business process approach

Process concept in business environments
Processes adhere to all daily doings or activities within an organization. In fact originally the process concept just denoted action or operation. Business processes particularly are processes for fulfilling the business needs of an organization. Business processes consit of interlinked different business activities, "elementary processes".
Structural questions of business processes are interesting from management's point of view for increasing process efficiency. In some cases, however, there has been a danger that structural aspects, e.g. process diagrams, are being over-emphasized in process management. Business structure and business processes are orthogonal issues to each other. Processes should have primary role and structure, e.g. organizational chart and process diagrams, is a secondary issue.
Business process management
Process management is a comprehensive business management issue. Today truly effective and efficient process management implies a radical change to the traditional established management thinking and structures in organizations. Process management as a management practice has a remarkable role in both "getting better" (strategic change) and "earning money" (operational run).
Business management is realized through process / project management. Projects are singular processes for singular business tasks. Basic business processes imply continuously running business activities. A major challenge for the top management is to convert a traditional vertically emphasized hierarchical organization into an approach that consistently and effectively reinforces horizontally interlinked and interacting activities (i.e. business processes). Both strategic and operational management levels are involved in this approach, the strategic one focuses on the network of business processes (i.e. the whole business system) and the operational one on single processes and projects.
General development of the process approach within an organization starts normally from strong vertically organized functional business units, organizational "silos", and with a clear need to improve the effectiveness and efficiency and customer-focus of the organization. Development means movement towards emphasis on horizontal business processes for providing products (goods and services) to the customers. This development is always in practice a long-term development journey. 
Process management consists of planning, controlling, improving the operations, and assuring quality. Most practical general model for process management is PDCA (Plan + Do + Check + Act) (see the diagram).

The basic lines of process management include:
- Management of existing processes based on existing plans: process network and individual processes
- Process re-engineering, i.e. improvement of process plans and structures

People issues in process management
A critical issue for process performance is the operation of individual human performers within processes. This should include also mental and knowledge aspects.
One of the most difficult questions in practice is the clear understanding of roles of the process owners and line managers. In fact, there could be no process management without a process owner. Process owner's responsibilities should be clearly defined. There is always a potential risk of conflicting interests between the roles of process owners and line managers.

Information technology for business processes
Process automation and modern collaborative software applications are important challenges in using information and communication technology (ICT) in the development of business processes and their management.
The use of information have been increased overwhelmingly within all kinds of organizations, and particularly in business processes. However, often only ICT solutions have been emphasized. This has induced to difficult situations in many business cases because, ICT is much more than only a technological issue. One should also take into account thinking, understanding, competences, skills, commitment, and feelings of the users of the technological systems in business processes. These things are linked to the tacit or implicit knowledge of people.
Modern Web-operated social networking applications have a wide variety of applications for business process management. They are particularly useful for connectivity, interactivity, and sharing information and knowledge taht are key issues in operations and development of business processes.
Business processes in modern business environments
Process management calls for responding to the realities of the modern business environments and especially nowadays the needs for managing variety and agility. Managing process complexity goes beyond simplistic tools, and the managing feedback loop needs to be much faster than the business system's response time. The modern business environments require especially understanding organizations as complex responsive processes of relating.
Challenges for continual development and learning
Comprehensive enhancement of the business process approach is carried out according to the principles of organizational learning. That is also a good and practical basis of quality management development and establishing solutions for quality integration and quality assurance.
Practice proves that process management is a very simple thing, but its implementation seems incredibly difficult because it always puts a strain on the organization's leadership issues. Development of the business processes and their management is a long-term effort and should take into account realities of business environments in question.

Friday, February 26, 2010

Saturday, November 21, 2009

Quote of Life

Just got a chance to share some thing interesting. Very True thought... so live 100%...with 0% of worry.. cheers..


"Don't take life seriously.

Life is not meant to be taken seriously, as we are really temporary here.

We are like a pre-paid card with limited validity.

If we are lucky, we may last another 50 years.

And 50 years is just 2,500 weekends.

Do we really need to get so worked up?..

"Don't be serious, be sincere"!!

Sunday, November 1, 2009

Interesting Facts about Human Body


Interesting Facts about Human Body
-Scientists say the higher your I.Q. The more you dream

-The largest cell in the human body is the female egg and the smallest is the male sperm.
















-Scientists say the higher your I.Q. The more you dream


Wednesday, September 2, 2009

Do you know

 1. Chewing on gum while cutting onions can help a Person from stop producing tears. Try it next time you chop onions!!!!!!!!!!


2. Until babies are six months old, they can breathe and swallow at the same time. Indeed convenient!


3. Offered a new pen to write with, 97% of all people will write their own name.


4. Male mosquitoes are vegetarians. Only females bite.


5. The average person's field of vision encompasses a 200-degree wide angle.


6. To find out if a watermelon is ripe, knock it, and if it sounds hollow. Then it is ripe.


7. Canadians can send letters with personalized postage stamps showing their own photos on each stamp.


8. Babies' eyes do not produce tears until the baby is approximately six to eight weeks old.


9. It snowed in the Sahara Desert in February of 1979.


10. Plants watered with warm water grow larger and more quickly than plants watered with cold water.


11. Wearing headphones for just an hour will increase the bacteria in your ear by 700 times.


12. Grapes explode when you put them in the microwave.


13. Those stars and colours you see when you rub your eyes are called phosphenes.


14. Our eyes are always the same size from birth, but our nose and ears. Never stop growing.


15. Everyone's tongue print is different, like fingerprints.


16. Contrary to popular belief, a swallowed chewing gum doesn't stay in the gut. It will pass through the system and be excreted.


17. At 40 Centigrade a person loses about 14. 4 calories per hour by Breathing.


18. There is a hotel in Sweden built entirely out of ice; it is rebuilt Every year.


19. Cats, camels and giraffes are the only animals in the world that walk Right foot, right foot, left foot, left foot, rather than right foot, left Foot...


20. Onions help reduce cholesterol if eaten after a fatty meal.


21. The sound you hear when you crack your knuckles is actually the sound of nitrogen gas bubbles bursting.


22. In most watch advertisements the time displayed on the watch is 10:10 because then the arms frame the brand of the watch And make it look=20 like it's smiling.


23. The color blue can have a calming affect on people.


24. Depending upon the shade, the brain may send up to 11 tranquilizing Chemicals to calm the body


25. Leonardo DA Vinci could write with the one hand and draw with the other simultaneously. Now we know why his pictures were exquisite!!


26. Names of the three wise monkeys are: Mizaru (See no evil), Mikazaru (Hear no evil), and Mazaru (Speak no evil).


27. The only 2 animals that can see behind itself without turning it's head are the rabbit and parrot.


28. The only 15 letter word that can be spelled without repeating a letter is uncopyrightable.


29. Babies are born without knee caps. They don't appear until the child Reaches 2-6 years of age


30. The names of the continents all end with the same letter with which they start.


31. Electricity doesn't move through a wire but through a field around the wire.


32. All U.S. Presidents have worn glasses; some of them just didn't like to be seen wearing them in public.


33. No word in the English language rhymes with month, orange, silver, and purple.


34. Raw cashews are poisonous and must be roasted before.

Saturday, August 29, 2009

Eco Architecture: Compact solar home gives new meaning to ‘modular’ prefabs

Eco Architecture: Compact solar home gives new meaning to ‘modular’ prefabs
google_protectAndRun("ads_core.google_render_ad", google_handleError, google_render_ad);
Eco Factor: Self-sufficient home design is powered by solar energy.
Designers over at System Design Studio have designed a new prefab home, which with its abilities and self-sufficiency might transform our knowledge of a “modular home”. The basic concept of the home consists of a module, which meets the daily living needs of an ordinary household. The basic living space has three standalone units – bathroom, kitchen and storage. The rest of the space can be used to add more modules that can be used as living rooms, children’s rooms and bedrooms.
The units can be moved by means of a rail system, which enables the owners to modify their home in anyway they like to. Additional modules can be added vertically and horizontally to the basic module allowing the owners to resize their home according to their needs. The home has been designed around an array of solar modules that generate enough electricity to illuminate the interiors with LED lights. Rainwater is collected via an adapted system on the roof, which captures and processes rainwater for non-potable uses. Overall it makes sure that you don’t pollute the environment by constructing your dream house and also promises that you won’t have to pay a single cent in electricity bills all through your life.
The Dark Side: